M03-B Containerized Fresh & Brackish Water RO System

M03-B BWRO systems for freshwater, groundwater and brackish water. Ten models from 100 to 1,000 m³/day of RO product water at rated conditions and 24 h/day.

Product overview

M03-B integrates brackish-water reverse osmosis and pretreatment in a container. It is designed for defined freshwater and brackish-water duties, with intake, storage and application-specific post-treatment selected for the site.

Structure and treatment process

M03-B Containerized Fresh & Brackish Water RO System — product illustration
System layout illustration; final configuration follows the approved engineering design.

Raw-water storage → feed pump → multimedia filtration → 5 μm cartridge filtration → high-pressure pump → BWRO → post-treatment and product-water storage. UF and iron/manganese removal are selected from the water analysis; flushing and CIP depend on the selected configuration.

Technical specifications and selection

Parameter Specification
Model M03-B
Rated RO product-water range 100–1,000 m³/day at 24 h/day
Membrane process BWRO
Salt rejection ≥99% design target, confirmed at specified feed conditions
Recovery and energy demand Specified for feed water, membrane configuration and equipment boundary

Ten rated models: 100–1,000 m³/day

Model RO output (m³/day) RO output (m³/h) Container
M03-B-100 100 4.17 20GP
M03-B-200 200 8.33 20GP
M03-B-300 300 12.50 20GP
M03-B-400 400 16.67 40GP
M03-B-500 500 20.83 40GP
M03-B-600 600 25.00 40GP
M03-B-700 700 29.17 40GP
M03-B-800 800 33.33 40GP
M03-B-900 900 37.50 40GP
M03-B-1000 1000 41.67 40GP

Daily capacity means RO product water at rated conditions and 24 operating hours, not raw-water intake or blended supply. Actual daily output changes with effective operating hours and feed conditions. Drinking-water use requires appropriate post-treatment, disinfection and water-quality acceptance.

Container dimensions are external shell dimensions. Allow additional space for piping, access, maintenance, intake, storage and other external equipment.

Dimensions and deployment

Choose the capacity first, then check the reference container and site conditions. Dimensions below are external shell dimensions.

20GP standard container

Reference models: M03-B-100 / 200 / 300

20GP external dimensions: 6058 long, 2438 wide and 2591 high, in millimetresSide viewEnd view6,058 mm2,438 mm2,591 mm

L 6,058 × W 2,438 × H 2,591 mm

External envelope schematic; internal equipment arrangement and installation clearances are not shown.

40GP standard container

Reference models: M03-B-400 – M03-B-1000

40GP external dimensions: 12192 long, 2438 wide and 2591 high, in millimetresSide viewEnd view12,192 mm2,438 mm2,591 mm

L 12,192 × W 2,438 × H 2,591 mm

External envelope schematic; internal equipment arrangement and installation clearances are not shown.
Allow space for maintenance, pipework, intake, storage and other site equipment. Confirm transport, lifting, foundations and interfaces against the selected configuration and final general arrangement.

Applications and use

Remote communities, field camps, irrigation and process-water supply using suitable freshwater or brackish water. Select post-treatment and acceptance criteria for the intended use.

Irrigation application illustration
Irrigation application illustration — illustration from the current product manual.

Agricultural irrigation

Match treatment to the source and crop requirements

Review salinity, ion composition and crop-water requirements before selecting the membrane system, storage and distribution. Any blending ratio must follow the target irrigation water quality.

Community supply application illustration
Community supply application illustration — illustration from the current product manual.

Community water supply

Consider production, storage and demand peaks together

Select capacity from daily demand and effective production hours. Allow for peak-use storage and distribution; drinking-water duty also requires post-treatment, disinfection and water-quality acceptance.

Camp supply application illustration
Camp supply application illustration — illustration from the current product manual.

Camps and remote worksites

Prepare transport access and site utilities

Review road and lifting access, power, pipe connections, concentrate handling and maintenance space before deployment. Intake and storage equipment are selected for site conditions.

View M03 series equipment reference
M03 series equipment reference
M03 series equipment reference; equipment reference, not evidence of a specific project delivery.

Frequently asked questions

Does the series start at 100 m³/day?

Yes. M03-B-100 through M03-B-1000 provide ten fixed rated capacity options in 100 m³/day steps. Daily output is calculated at rated conditions and 24 operating hours.

Which water sources are suitable?

For suitable surface freshwater, groundwater and brackish water. Use the separate M03-S SWRO series for a confirmed seawater desalination duty.

How should daily demand be converted to a model?

Divide the required daily RO product water by effective production hours. For example, 175 m³ over 20 hours requires 8.75 m³/h; the 200 m³/day model is about 8.33 m³/h, so assess the 300 m³/day model and its design conditions.

Product manuals and enquiries

Download English product manual (PDF) · 中文版 PDF

Product information edition: September 2026. For procurement, confirm the supplied configuration, feed-water limits, applicable test documents and acceptance requirements with ZeYuan.

Discuss your water source and request a quotation

Model

M03-B

Scroll to Top

Contact ZeYuan

Contact and project details are used to handle your enquiry and related business communication. Enquiry information notice.