M03-S Containerized Seawater Desalination System

M03-S SWRO systems with ten rated RO output models from 100 to 1,000 m³/day, based on 24 h/day operation. 20GP and 40GP container configurations.

English datasheet (PDF, 4 pages) · 中文版产品资料(PDF,4 页)

Product overview

M03-S integrates seawater reverse osmosis and pretreatment in a transportable container. Feed salinity, temperature, pretreatment, recovery and the intended water use determine the final configuration.

Structure and treatment process

M03-S Containerized Seawater Desalination System — product illustration
System layout illustration; final configuration follows the approved engineering design.

Intake → pretreatment → cartridge filtration → high-pressure pump → SWRO → post-treatment and product-water storage. The M03-S-100 reference configuration excludes energy recovery; M03-S-200 through M03-S-1000 include it. Confirm the final bill of materials.

Technical specifications and selection

Parameter Specification
Model M03-S
Rated RO product-water range 100–1,000 m³/day at 24 h/day
Membrane process SWRO
Salt rejection ≥99% design target, confirmed at specified feed conditions
Recovery and energy demand Specified for feed water, membrane configuration and equipment boundary

Ten rated models: 100–1,000 m³/day

Model RO output (m³/day) RO output (m³/h) Container Energy recovery
M03-S-100 100 4.17 20GP Excluded
M03-S-200 200 8.33 20GP Included
M03-S-300 300 12.50 20GP Included
M03-S-400 400 16.67 40GP Included
M03-S-500 500 20.83 40GP Included
M03-S-600 600 25.00 40GP Included
M03-S-700 700 29.17 40GP Included
M03-S-800 800 33.33 40GP Included
M03-S-900 900 37.50 40GP Included
M03-S-1000 1000 41.67 40GP Included

Daily capacity means RO product water at rated conditions and 24 operating hours, not raw-water intake or blended supply. Actual daily output changes with effective operating hours and feed conditions. Drinking-water use requires appropriate post-treatment, disinfection and water-quality acceptance.

Container dimensions are external shell dimensions. Allow additional space for piping, access, maintenance, intake, storage and other external equipment.

Design inputs to confirm before a quotation

Use the following project inputs with the model table. Project-specific recovery, energy use and electrical load must be confirmed for the selected feedwater and equipment configuration.

  • Feedwater: provide seawater salinity, ionic composition, pH and temperature, or tell us when the analysis will be available. Confirm pretreatment against that analysis.
  • Process configuration: disinfection, dechlorination, antiscalant dosing and pH adjustment are selected for the feedwater conditions.
  • Product-water duty: state the intended use and acceptance requirements. Drinking-water applications require suitable post-treatment, disinfection and testing; the salt-rejection design target alone is not a drinking-water compliance statement.
  • Power: confirm an external supply or generator. Voltage, frequency and load are determined by model and final configuration.
  • Supply boundary: confirm the scope of seawater intake, product-water storage, CIP and other supporting equipment for the selected model. Allow additional site space for pipework and maintenance access.

Basis: M03-S product information, September 2026. Project-specific design values and acceptance documents must be agreed for the proposed configuration.

Dimensions and deployment

Choose the capacity first, then check the reference container and site conditions. Dimensions below are external shell dimensions.

20GP standard container

Reference models: M03-S-100 / 200 / 300

20GP external dimensions: 6058 long, 2438 wide and 2591 high, in millimetresSide viewEnd view6,058 mm2,438 mm2,591 mm

L 6,058 × W 2,438 × H 2,591 mm

External envelope schematic; internal equipment arrangement and installation clearances are not shown.

40GP standard container

Reference models: M03-S-400 – M03-S-1000

40GP external dimensions: 12192 long, 2438 wide and 2591 high, in millimetresSide viewEnd view12,192 mm2,438 mm2,591 mm

L 12,192 × W 2,438 × H 2,591 mm

External envelope schematic; internal equipment arrangement and installation clearances are not shown.
Allow space for maintenance, pipework, intake, storage and other site equipment. Confirm transport, lifting, foundations and interfaces against the selected configuration and final general arrangement.

Applications and use

Island and coastal supply, resorts, remote communities and coastal worksites. Select post-treatment, storage and disinfection for the intended drinking, domestic or process-water use.

Coastal resort application illustration
Coastal resort application illustration — illustration from the current product manual.

Coastal resorts

Coordinate desalination with seasonal demand

Review seawater salinity, temperature and effective operating hours, then match the SWRO configuration and storage to the facility demand. Select post-treatment and disinfection for the intended use.

Island community application illustration
Island community application illustration — illustration from the current product manual.

Community water supply

Consider production, storage and demand peaks together

Select capacity from daily demand and effective production hours. Allow for peak-use storage and distribution; drinking-water duty also requires post-treatment, disinfection and water-quality acceptance.

Coastal worksite application illustration
Coastal worksite application illustration — illustration from the current product manual.

Camps and remote worksites

Prepare transport access and site utilities

Review road and lifting access, power, pipe connections, concentrate handling and maintenance space before deployment. Intake and storage equipment are selected for site conditions.

View M03 series equipment reference
M03 series equipment reference
M03 series equipment reference; equipment reference, not evidence of a specific project delivery.

Selecting 100–300 m³/day models for island water supply

  1. Define water quality and demand. Confirm seawater as the source, the intended water use and peak daily RO product-water demand. Include storage and distribution in the site supply plan.
  2. Calculate the required hourly RO output. Divide daily RO product-water demand by effective production hours, rather than assuming every project will run for 24 hours.
  3. Compare the fixed models. For an illustrative demand of 175 m³/day over 20 production hours, the required output is 8.75 m³/h. M03-S-200 is rated at about 8.33 m³/h, so assess M03-S-300 or above against the design conditions. The 100, 200 and 300 models use 20GP containers; energy recovery is excluded on the 100 model and included on the 200 and 300 models.
  4. Check the whole installation. Coordinate the selected configuration with power, intake, storage, concentrate handling and service access before accepting a quotation.

What the quotation should make clear

Ask for the feedwater design basis, rated RO product-water output and operating hours, the boundary used for energy figures, included and excluded equipment, and product-water acceptance requirements. The example above explains selection arithmetic; it is not a site-specific output guarantee.

Frequently asked questions

Does the series start at 100 m³/day?

Yes. M03-S-100 through M03-S-1000 provide ten fixed rated capacity options in 100 m³/day steps. Daily output is calculated at rated conditions and 24 operating hours.

Which water sources are suitable?

For seawater duties selected around feed salinity, temperature and the full analysis. It is a separate SWRO series from M03-B freshwater and brackish-water systems.

How should daily demand be converted to a model?

Divide the required daily RO product water by effective production hours. For example, 175 m³ over 20 hours requires 8.75 m³/h; the 200 m³/day model is about 8.33 m³/h, so assess the 300 m³/day model and its design conditions.

Product datasheets and enquiries

M03-S product datasheet (PDF, English, 4 pages) · 产品与选型资料(PDF,中文,4 页)

Product information edition: September 2026. For procurement, confirm the supplied configuration, feed-water limits, applicable test documents and acceptance requirements with ZeYuan.

Discuss your water source and request a quotation

Model

M03-S

Scroll to Top

Contact ZeYuan

Contact and project details are used to handle your enquiry and related business communication. Enquiry information notice.